According to the State Agency of Azerbaijan Automobile Roads, 41 km of roads are separated from the Mingachevir – Mingachevir – Bahramtepe highway of republican significance.
According to the project, the roadbed will be reconstructed in several directions: these are roads with a length of 27.4 km leading to the villages of Avshar (5.6 km), Salmanbeyli (2.9 km), Ashagi Avshar (4.5 km) and Khojavend (0 ,6 km).
At the final stage of the project, four bus stops will be built along the road, 72 traffic signs and information boards, 840 safety posts and road signs will be installed, and modern road infrastructure will be created.
Source: Baku Travel Guide
What’s your Reaction?