In accordance with the Order of the President of the Republic of Azerbaijan “On measures related to the construction of the Arabgedim-Goydarya highway in the Gobustan region”, reconstruction work carried out by the State Agency of Azerbaijan Automobile Roads has been completed.
As part of the restoration work along the road, the unusable soil was replaced with useful material. The road is 13 km long. was expanded from 6-7 meters to 10 meters and graveled to obtain the standard width.
Source: Baku Travel Guide
What’s your Reaction?