As part of a joint project between SOCAR Petroleum and CZAR INTERNATIONAL, the installation of equipment for charging electric vehicles has begun at gas stations under the SOCAR brand.
The company reports that the first installation of a 20 kW charger was carried out at a SOCAR gas station on the Salyan highway, not far from the Bibiheybat mosque. It will serve two electric vehicles at the same time and can be fully charged in 30-60 minutes, depending on the make and model of the vehicle.
By the end of this year, all gas stations operating under the SOCAR brand on the Absheron Peninsula, as well as in Siyazan, Gusars, Shamakhi, Sheki, Goran, Hajigabul, Gobustan, Salyan, Lerik and Shusha, will install and commission chargers under the brand CZAR INTERNATIONAL.
Source: Baku Travel Guide