As part of the reconstruction work carried out on G.Z.Tagiyev Street in the Mardakan settlement, the top layer of the old asphalt concrete pavement was milled along the street, the existing footpaths were restored, new sidewalks were built in the necessary places, new sidewalks were laid, special parking spaces were created to ensure convenient and safe parking of vehicles. This was reported by the State Agency of Azerbaijan Automobile Roads.
In addition, during the repair work, the existing rainwater drainage system was restored to drain surface water from the roadway, new rain panels were installed, and the inspection covers of communication lines were replaced.
Source: Baku Travel Guide
What’s your Reaction?