In connection with the unsatisfactory condition of the road surface and long-term operation without proper repair work, the reconstruction of Mirali Gashgay street has begun. This was reported by the State Agency of Azerbaijan Automobile Roads.
The project provides for the renovation of the asphalt pavement along a 2.3-kilometer street in the Nasimi district of the capital. At the moment, work has been completed on its 1.4-kilometer part. At the final stage, the necessary road signs will be installed along the street, road markings will be applied.
Source: Baku Travel Guide
What’s your Reaction?