The State Agency of Azerbaijan Automobile Roads announced the completion of the reconstruction of the Guba-Gonagkend highway connecting 66 settlements with a total population of 68 thousand people and a length of 46 kilometers.
The Guba-Gonagkend road was reconstructed in accordance with III and IV technical levels in accordance with the terrain. The width of the roadbed is 12 and 10 meters, and the carriageway is seven and six meters.
Work was carried out to widen the road in the village of Tangealty. The widening of the road covered a section of 29-30 kilometers of the Guba-Gonagkend highway. The road was widened from four to 10 meters.
Source: Baku Travel Guide
What’s your Reaction?